
Medical · Agriculture · General freight
Promac moves clinical cargo, harvest and produce, and everyday freight of every kind — with one control tower that stays on the file until it is in the right hands.
99.6%
On-time, last 12 months
24/7
Staffed control tower
3
Practice areas, one tower
All modes
FTL, LTL, reefer, bulk, air, ocean
From start to finish
Promac Services — your partner in freight management and logistics. Warehouse, transportation, and last-mile delivery on one film.
What we run
A cooler, a hopper, and a dry van are different jobs. Promac books the iron the cargo actually needs — and keeps a human on the file either way.

Clinical cargo
Temperature-validated, chain-of-custody freight for therapies, devices, and hospital replenishment — handled like a procedure, not a parcel.

Field to processor
Grain, seed, feed, and produce moved on the calendar the crop actually keeps — bulk hoppers, reefers, and packing-house appointments that do not slip.

Every mode, one owner
FTL, LTL, reefer, air, ocean, and expedite booked against a playbook — not the cheapest empty trailer at 4 p.m.

Medical
Therapies, devices, and hospital replenishment move on dedicated equipment with a named receiver and a temperature file that survives audit.

Agriculture
Grain, seed, feed, and fresh produce move on hopper and reefer equipment that matches the house — elevator pits, packing docks, and processor windows included.
General freight
Ordinary freight is still freight. We run it with the same tower that runs the coolers and the hoppers.
FTL
Dry van, reefer, exclusive use
LTL
Appointed delivery, not a lottery
Bulk
Hopper, pneumatic, bulk bag
Reefer
Produce, pharma, CRT
Air
Time-critical and high value
Ocean
FCL, LCL, and bonded
How a lane starts
01
Temperature, bulk or piece, harvest window, receiving constraints, and what a miss actually costs. We write the playbook before we book the truck.
02
Equipment, packaging, and the right yard or elevator are nominated and confirmed. You get a named control-tower owner.
03
Seals, telemetry, and milestone pings. Exceptions surface in minutes, with a human already working the recovery.
04
Proof of delivery, logger or scale tickets, photos, and a short after-action if anything was off. Then we tighten the next run.

From the floor
“They treat a cooler like a patient. Our OR schedule stopped slipping because a driver ‘almost’ made the window.”
Director of Supply Chain
Regional health system, Mid-Atlantic
“Harvest week used to mean three brokers and a prayer. Promac showed up with hoppers that actually fit our pit.”
General Manager
Cooperative elevator, Iowa
“We ship everything from cartons to project freight. One tower, one standard — they do not disappear when the cargo is ordinary.”
VP, Logistics
National distributor
Cooler, hopper, or dry van. A two-hour first reply from the control tower — sooner if the window is already on the board.